Uncategorized
-
Lap length in Reinforcement
Lapping is required when a bar isn’t long enough or a joint is required. Bars may be deliberately left short for constructability and transportation concerns. The preferred method of lapping is where the two bars…
-
Site selection and Site Investiigation
Importance of Site Survey before starting any work of a building construction project To ensure the feasibility and practicability of a project To verify the legal implication of existing boundaries, access, right of way of…
-
Roof of a building
The roof is an essential part of every building. Technically speaking, the roof refers to the framework of either timber, steel, or concrete on which a covering of thatch, tile, corrugated asbestos, etc is placed.…
-
Sill
Generally, sill concrete is poured to withstand the load of the window and transfer the load to the column. The sill level from the DPC level is found and marked using the tube level, and…
-
Stools in slab concreting
Stools are used to separate the top reinforcement mesh and bottom reinforcement mesh. It’s essential to maintain the accurate thickness of the slab. Dimensions of the Stools could be changed as per requirement. Those should…