Top Tags
Top Story
Most Recent Articles
-
Controlled dump site
A controlled dump site is a particular site previously used for open dumping. Proper planning is required. Consists of minimal infrastructure requirements. The selected site should have suitable hydrological…
-
Features of Primavera P6
Risk management Identify, track and resolve risks before they become issues Timelines A traditional Gantt chart to schedule tasks on a bar graph Reporting & Analytics Ability to generate…
-
Introduction to Project
A project can be defined as a group of tasks performed in a definite time period to meet a specific set of objectives or the scope, time, cost, risk…
-
Segregation in freshly poured concrete
The separation of the aggregate particles from the cement paste, resulting in a non-uniform distribution of materials in the concrete mix can be called Segregation in concrete. The consequences…